IMPLEMENTATION OF BIM/VIRTUAL CONSTRUCTION

Quantification/Calculations

BIM Coordination/Clash Detection

BIM Coordination/Clash Detection

image136

  • Linear feet of conduit, pipe, all-thread
  • Quantification of fittings, parts, etc.
  • Photometric analysis

BIM Coordination/Clash Detection

BIM Coordination/Clash Detection

BIM Coordination/Clash Detection

image137

  • Reduces RFI's
  • Reduces Change Orders
  • Efficiently resolve design and coordination issues long before they become problems in the field

From Virtual Construction to Field Construction

From Virtual Construction to Field Construction

From Virtual Construction to Field Construction

image138

  • Prefabrication sheets
  • Installation drawings
    • Verification that everything is installed correctly based off of the model
  • Total station points
    • Insures items are installed where they were intended

Results

From Virtual Construction to Field Construction

From Virtual Construction to Field Construction

image139

The culmination of the virtual construction process being used to generate Total Station points while simultaneously producing prefabrication and installation drawings deliver proven results that expedite the construction process and minimize time lost in the field.